During the months of December 2020 and January 2021 IPMA CONSULTORIA has performed the related works corresponding to Pull Out Test for a Photovoltaic Solar Plant in Tangier, Morocco.
For this purpose, a field work campaign was designed based on:
- Direct pile Ramming
- Predrill pile Ramming
- Pull Out Test
- Shear test
Following the completion of the field campaign, several drawings have been developed that graphically show the results obtained.
These extrapolations allow the client to obtain a global idea of the behavior of his structure within the site and, in addition, show the problem areas:
In the following example, it can be recognized how, the central-eastern area of the plot shows a higher point resistance when direct driving is performed: