In August and september 2014, IPMA performed geotechnical studies and ramming pole test for five solar plants in Atacama Desert. As a result, our team has designed a field-work campaign based on:
- Vertical pull-out capacity test results.
- Lateral load capacity test results.
- Assessment of corrosion potential.
- Terrain Geotechnical Characteristics.