In August and september 2014, IPMA performed geotechnical studies and ramming pole test for five solar plants in Atacama Desert. As a result, our team has designed a field-work campaign based on:

  • Vertical pull-out capacity test results.
  • Lateral load capacity test results.
  • Assessment of corrosion potential.
  • Terrain Geotechnical Characteristics.